House renovation cost in Australia

A plain-English guide to what drives the price of a whole-house renovation, where the money goes, and how to turn an estimate into a quote you can rely on.

Last updated 24 November 2026 · by Reno Cost Calculator

Key takeaways

  • The scope of work is the biggest driver: a cosmetic refresh and a full strip-back are different projects.
  • Floor area, structural changes and the age and condition of the house come next.
  • Whole-house estimates are less certain than single rooms, so keep a contingency of your own.
  • An estimate sets your budget; only written quotes on a detailed scope set the price.

How much does a house renovation cost?

Costs vary mainly with the scope of work, then the floor area and the city. For a standard renovation of the default size, our calculator estimates $161,931, with a planning range of $137,641 to $186,221. A cosmetic refresh sits well below that and a full or premium renovation well above it, as the table below shows.

Every figure on this site is a range, not a single price, and whole-house jobs vary more than any single room. The bigger the project, the more it depends on what is behind the walls and on decisions you have not yet made.

The table shows the estimate for each scope of work at three floor areas, using the default city. Use it to see how sharply cost climbs as the scope grows, then use the calculator to match your own home.

Estimated total by scope of work and size (Brisbane, QLD, GST included). Planning range shown underneath.
Scope of work 80 m²120 m²180 m²
Cosmetic refresh $40,072 $34,061 - $46,083 $56,993 $48,444 - $65,542 $82,371 $70,015 - $94,727
Standard renovation $111,478 $94,756 - $128,200 $161,931 $137,641 - $186,221 $238,117 $202,399 - $273,835
Full renovation $194,437 $165,271 - $223,603 $283,829 $241,255 - $326,403 $417,507 $354,881 - $480,133
Premium renovation $300,082 $255,070 - $345,094 $437,693 $372,039 - $503,347 $643,367 $546,862 - $739,872

What do the scope levels mean?

A cosmetic refresh keeps the layout and wet areas and updates surfaces such as paint, floor coverings and lighting. A standard renovation also updates the kitchen and bathroom. A full renovation strips back most rooms and replaces wiring and plumbing runs, and a premium renovation adds high-end finishes and custom joinery throughout.

Pick the level that matches the work you actually plan to do, not the finish you would like. Many people underestimate the scope: a renovation that touches the kitchen, bathrooms and floors is a standard renovation, not a cosmetic one, however plain the finishes.

If your plans fall between two levels, run the calculator at both and treat the difference as the part of the budget that depends on decisions still to be made.

What drives the cost of a house renovation?

The scope of work drives most of the cost, followed by the floor area you renovate, whether walls come out, and the age and condition of the house. City and access change the price as well, but a clear scope is the single best way to understand and control a whole-house budget.

Most trades price by the square metre, so cost grows with the area you renovate. That is why the calculator asks for the floor area being renovated rather than the size of the whole block or house.

Wet areas are the most expensive rooms per square metre, because they need plumbing, waterproofing and tiling. A house with more bathrooms and a larger kitchen costs more to renovate than one with the same floor area and fewer wet areas.

Structural changes are the next big lever. Taking out a wall can open up a home beautifully, but it needs engineering, temporary propping, a beam and making good, and it often triggers other work such as electrical and flooring changes.

Finally, the condition of the house matters. Older homes can hide wiring, plumbing or framing problems that only appear once the walls are open.

Where does the money go in a house renovation?

A whole-house budget splits into fixed costs for planning, set-up and supervision, area-based costs that grow with the floor area, a city adjustment, any structural changes, an allowance for provisional sums and, in Queensland, the QBCC home warranty premium. The breakdown below shows how the default estimate divides across those lines.

Fixed costs cover coordination, site set-up and supervision, which do not shrink much on a small job. Area-based costs cover the trades and materials that scale with the size of the renovation.

The city adjustment reflects regional differences in labour and material costs. The provisional sums allowance covers items that cannot be priced until decisions are made, such as light fittings or hardware. In Queensland, residential building work above $3,300 needs home warranty insurance from the QBCC, and the premium, worked out from the published table, is passed on in the price, so it appears as its own line.

Where the default estimate goes (Brisbane, QLD, mid-range, GST included).
Cost lineAmountShare
Fixed costs $8,000 5%
Area-based costs $150,000 93%
Provisional sums allowance $2,500 2%
QBCC home warranty insurance $1,431 1%
Total$161,931100%

How much do structural changes add?

Structural changes are added as a flat amount in the calculator because they depend on the job rather than the floor area. Removing one load-bearing wall needs engineering, propping and a beam, and an open-plan layout that removes several walls costs far more, so it is worth deciding early whether you really need it.

A wall that carries the roof or an upper floor cannot simply be removed. An engineer designs the beam and the supports, the builder props the structure while the wall comes out, and the ceiling, walls and floors around it all need making good.

Ask any builder to separate structural work from the rest of the scope in their quote so you can see what an open-plan layout adds and decide whether it is worth it.

How does the age of the house affect the cost?

Older houses carry more risk because wiring, plumbing and framing may need repair or replacement, and homes built before the 1990s may contain asbestos-containing materials that need to be identified and handled safely. None of this appears in a simple estimate, so keep a contingency for what you find once the walls are open.

Ask a builder to inspect the house before you finalise a budget. Old switchboards, aged wiring, worn pipework and damaged framing are the typical surprises, and finding them early is far cheaper than finding them mid-project.

If the house may contain hazardous materials, get advice on testing and safe removal before any demolition starts. It protects your family and the trades, and it avoids a costly stop-work in the middle of the job.

Does my city change the price?

Yes. Labour rates, material delivery and tradie availability differ between cities, so the same renovation costs more in some places than others. The calculator applies a city adjustment to the main costs, and the table below shows the default estimate for each city so you can compare.

City differences are an average, not a rule. A busy local market can push prices above the average, while a quiet one can bring them down. Treat the city adjustment as a sensible starting point for your budget rather than a promise.

Default estimate by city (mid-range, GST included).
CityCity adjustmentEstimatePlanning range
Brisbane, QLD 1.00x $161,931 $137,641 - $186,221
Gold Coast, QLD 1.04x $168,346 $143,094 - $193,598
Sunshine Coast, QLD 1.06x $171,553 $145,820 - $197,286
Sydney, NSW 1.22x $195,260 $165,971 - $224,549
Melbourne, VIC 1.10x $176,300 $149,855 - $202,745
Perth, WA 1.12x $179,460 $152,541 - $206,379
Adelaide, SA 0.98x $157,340 $133,739 - $180,941

Can I renovate a house in stages?

Yes, and many people do. Staging spreads the cost over time and lets you live in the house, but it can cost more overall because trades return several times and some work, such as rewiring, is cheaper done once. Plan the whole scope first, then decide the order, so early stages do not have to be undone.

A common order is structural and services work first, then wet areas, then flooring, painting and finishes. Doing the dusty and disruptive work before the finishing work protects what you have already paid for.

If you stay in the house during the work, ask the builder how the project will be staged, which rooms will be unusable and for how long.

What is not included in a house renovation estimate?

An estimate covers the renovation work itself. It does not include design or drafting fees, council or certifier fees, removal of hazardous materials, landscaping, furniture or temporary accommodation if you move out. Ask any builder what their quote includes and excludes before you compare prices.

These exclusions are the most common reason a finished renovation costs more than the first number you heard. Appliances and loose items may be supplied by you or by the builder, so confirm which.

How do I get an accurate house renovation quote?

Prepare a detailed written scope, with drawings if you have them, then ask local businesses for written quotes on that same scope. Compare like with like, check the licence number and insurance of each business, and be wary of a quote far below the others until you understand what has been left out.

A good quote breaks the work into stages, lists inclusions and exclusions, names allowances for items not yet chosen, and sets out a payment schedule tied to progress rather than a large upfront payment. In Queensland, check the builder's licence on the QBCC register before you sign.

If you would like help finding a local business to quote your job, press the button below and we will pass your details to one that can, if one is available.

Ready for a number you can plan around? Run the calculator, then press Get a real quote.

Open the calculator

How long does a house renovation take?

Whole-house renovations take months rather than weeks, and the length depends on the scope, the size of the house, approvals and the availability of trades. A cosmetic refresh can take weeks, while a full renovation with structural changes can take many months, so ask for a written schedule and expect it to move.

Delays usually come from approvals, materials arriving late or trades waiting on each other. A clear scope, decisions made before work starts and a builder who coordinates the trades keep the project moving.

House renovation cost questions

These are the questions people ask most often when budgeting a whole-house renovation, answered in the same terms as the calculator. Figures shown are estimates for the default selections and update with the calculator above, so use them as a guide to scale rather than a quote for your own home.

How much does a house renovation cost in Australia?

With the default selections the estimate is $161,931, with a planning range of $137,641 to $186,221. The scope of work is by far the biggest driver, followed by floor area, structural changes and the city you live in.

What is included in the house renovation estimate?

Trade labour and materials for the scope you choose, a fixed cost for planning, set-up and supervision, the builder's margin and GST. In Queensland it also includes the QBCC home warranty premium. Design fees, council fees, hazardous material removal and furniture are not included.

What is the difference between the scope levels?

A cosmetic refresh keeps the layout and wet areas and updates the surfaces. A standard renovation also updates the kitchen and bathroom. A full renovation strips back most rooms and replaces wiring and plumbing runs, and a premium renovation adds high-end finishes and custom joinery throughout.

Why are whole-house estimates less certain?

The bigger the job, the more it depends on what is behind the walls, the age of the house and the choices still to be made. A wider planning range and a contingency in your own budget are sensible for a whole-house renovation.

Do I need a licensed builder for a house renovation?

In Queensland, residential building work above a small value threshold must be done by a QBCC-licensed contractor, and home warranty insurance applies to most renovations. Ask to see the licence number and check it on the QBCC register before you sign.

How do I get an accurate price for my renovation?

Use the estimate to set a budget, then ask local businesses for written quotes on a detailed scope. Press Get a real quote and we will pass your details to a local business that can quote the job, if one is available.

Estimates only. Every figure on this site is an indicative range based on the details you enter, not a quote and not professional advice. Always confirm with a licensed builder before making a decision. How we calculate.